Project Management

Project management is the discipline that keeps a switchboard project on scope, schedule, budget and quality targets. At Devpan, every project is assigned a dedicated project engineer; planning, procurement, production, testing and commissioning are run from a single schedule and progress is reported regularly.

Approach

Our Approach to Project Management

Our main goal in project management is simple: finish the job on time, at the quality level in the contract and at the forecast cost. To achieve this we use the same framework on every project, while adapting the method to the project’s scale, delivery location and the customer’s internal processes.

We use up-to-date planning and tracking tools on our projects. The aim is to give the team real-time progress information and make sure everyone who needs to make decisions is looking at the same data. When a material delivery date slips, the milestone it affects is visible the same day.

Our teams, experienced in international projects, aim to make every project predictable, whatever its difficulty. The way to reduce surprises is to spot risks early and communicate transparently.

Single contactA dedicated project engineer and a backup contact for each project
WeeklyProgress report, photo-documented production tracking and revision log
3 stagesThree-stage quality gate: incoming, in-process and final inspection
FAT + SATTwo-stage verification with factory and site acceptance tests
Devpan engineering team working on the project schedule and project files in the project office
Planned and actual progress are compared every week on the same schedule.
Schedule tracking

The delivery date is set on the schedule established on the first day of the job.

Design, procurement, manufacturing, assembly and testing items are entered into a single work schedule; tasks on the critical path are tracked separately.

Once material lead times are entered, long-lead components are brought forward so the assembly line never stops waiting for materials.

Progress is reported by comparing planned and actual percentages. When a deviation occurs, it is shared together with its cause and a recovery plan.

At weekly progress meetings, open items, pending approvals and high-risk items are reviewed on a single list; decisions are sent in writing to the relevant teams the same day.

Items awaiting customer approval are tracked under a separate heading; if approval takes longer, the effect on the delivery date is calculated.

At project close-out, the work schedule, revision history and test records are archived together.

Process

Stage Flow of a Switchboard Project

At Devpan every switchboard project follows the same six-stage flow. The stages do not have hard boundaries: long-lead materials are ordered while design approval is pending, and the test plan is prepared while production is under way. Each stage ends with a tangible output and a mutual approval point. The project schedule is prepared specifically for each project after scope, approval speed and material availability have been assessed, and is defined in the contract together with its milestones.

Devpan pano projesi aşama akışıSözleşme ve başlangıç, tasarım ve onay, malzeme tedariki, üretim ve montaj, fabrika testleri ve sevkiyat ile devreye alma aşamalarını, her aşamanın çıktısını ve onay noktalarını gösteren dikey akış şeması. Şemada süre bilgisi yer almaz.1Contract & KickoffThe scope, technical specification and responsibility matrix are clarified; a dedicated project engineer is assigned to the project.Output: Project kickoff file, work breakdown structure2Design & ApprovalThe single-line diagram, layout, busbar and temperature-rise calculations are prepared and submitted for your approval.Output: Approved manufacturing drawings and bill of materialsApproval gate3Material ProcurementOrders are placed according to the approved list; long-lead items are prioritized and tracked.Output: Material acceptance and conformity records4Production & AssemblyEnclosure fabrication, busbar machining, device mounting, wiring and labeling are carried out in a controlled sequence.Output: Fully assembled, labeled panel5Factory Tests (FAT)IEC 61439 routine verifications and functional tests are performed, open to your participation.Output: FAT test report and corrective action recordAcceptance gate6Shipment & CommissioningPackaging, shipment, on-site installation support and site acceptance tests (SAT) are completed.Output: Commissioning report and handover file
The six stages of a switchboard project, the output of each stage and its approval points. Stages overlap as planned; the schedule is set separately for each project.
Stages

Project Stages

  • Kick-off and Scope Definition

    At the kick-off meeting after contract award, the scope, deliverables list, responsibility matrix and communication plan are put in writing.
  • Planning and Scheduling

    A work breakdown structure is prepared, and procurement, production, testing and shipping items are tied to the schedule through critical path analysis.
  • Design Approval Management

    The customer approval cycle for project documents is tracked, and the impact of approval delays on the schedule is reported immediately.
  • Procurement and Production Tracking

    Delivery dates of critical materials are monitored and production progress is documented with photos.
  • Testing and Acceptance

    Factory acceptance tests (FAT) are carried out with the customer present; shipment does not start until all findings are closed.
  • Commissioning and Close-out

    Site installation, SAT, training and handover of documentation are completed, and lessons learned are recorded.
Team

Roles and Responsibilities

Who is responsible for what is put in writing at the first meeting, so there is never any debate about who to contact when an issue comes up.

Roles, responsibilities and reporting in switchboard projects
RoleResponsibilityReporting
Project EngineerOverall tracking of scope, schedule and budget; single point of contact with the customerWeekly report, immediate notice of critical issues
Design EngineerProducing project documents, managing revisions and technical verificationApproval cycle meetings
Purchasing OfficerCritical material lead times, supplier performance and alternative sourcingUpdated delivery schedule
Production ManagerPlanning work orders, managing labor and capacityProduction progress report
Quality ManagerIncoming, in-process and final inspections and FAT protocolsInspection forms and test reports
Site ManagerCoordination of installation, commissioning, SAT and customer trainingDaily site report
Measurement

Performance Indicators We Track

What gets measured gets managed. The indicators below are tracked throughout the project, and corrective action is defined for any item that falls below target.

Performance indicators tracked in project management and their target values
IndicatorDefinitionTarget
Schedule performance (SPI)Actual progress relative to planned progress≥ 0,95
Approval cycle timeAverage days between document submission and approval≤ 5 days
Critical material on-time deliveryShare of critical items arriving on the promised date≥ %95
FAT first-pass rateShare of FATs completed without retesting≥ %90
Number of revisionsNumber of document revisions after approval≤ 2
On-time shipmentShare of projects shipped on or before the contract date≥ %95

Target values are references from Devpan’s internal quality system; contract-specific targets can be defined separately at the start of the project.

Risk

Risk Management

Most delays in switchboard projects stem from the same few causes. These risks are logged at the start of the project and a mitigation is defined for each.

  • Approval delays: While documents await approval, the production window narrows. The approval period is defined in the contract and the effect of any delay is reported immediately.
  • Critical material supply: Long-lead breakers and switchgear components are ordered early, and approval for alternative brands is obtained in advance.
  • Scope changes: Every additional request is logged as a written change request, presented with its schedule and cost impact.
  • Site not ready: A pre-installation site checklist is shared, and floor, trench and supply preparations are confirmed.
  • Technical mismatch: Interface points (cable sizes, terminal numbers, communication protocol) are agreed with the customer at the design stage.
  • Resource conflicts: Capacity for projects running in the same period is balanced on a shared schedule.
Communication

Reporting and Communication

  • Weekly progress report: Percentage progress, critical path status, open items and next week’s plan.
  • Photo-documented production tracking: Visual records of enclosure fabrication, busbar assembly, wiring and labeling.
  • Revision log: Every document version is archived with its date, reason and approver.
  • Milestone notices: Design approval, production start, FAT and shipment dates are announced in advance.
  • Open items list: All pending issues are tracked in a single list with an owner and due date.
  • Close-out file: As-built drawings, test reports, warranty documents and maintenance instructions delivered in one package.
Principle: Bad news early is worth more than good news late. When a deviation is detected, we don’t wait for the reporting day: it is reported the same day together with a proposed solution.

At a Glance

  • Goal: Deliver the project without deviating from budget, scope and schedule targets.
  • Single contact: A dedicated project engineer is assigned to each project, and all communication runs through one point.
  • Planning: The work breakdown structure, Gantt schedule and milestones are created right after contract award.
  • Tracking: Percentage progress, the critical path and the risk register are updated at regular intervals.
  • Reporting: The customer receives periodic progress reports, photo-documented production tracking and a revision log.
  • Close-out: The project is formally closed with FAT, shipment, on-site commissioning and handover of documentation.
FAQ

Frequently Asked Questions

What does project management cover in switchboard projects?

It covers the entire process from the post-contract kick-off to the warranty period: scope definition, work schedule, design approval tracking, procurement and production monitoring, quality inspections, FAT, shipment, on-site commissioning and documentation handover.

Who is assigned to my project and who will I be dealing with?

Each project is assigned a project engineer, who is your single point of contact. This person coordinates the design, purchasing, production and site teams; a backup contact is also defined.

How can I follow progress?

We share a weekly progress report, photo records of production and the updated Gantt schedule. If a critical deviation occurs, you are notified without waiting for the next report.

How long does a typical switchboard project take?

Delivery time is project-specific: scope, level of detail in the specification, speed of the approval cycle and the availability of long-lead materials are decisive. That is why we do not publish a standard lead time. After reviewing the technical specification, we prepare a project schedule with milestones, which is defined in the contract.

What affects delivery time the most?

In practice two factors stand out: the approval time for project documents and the supply schedule for long-lead switchgear components. Both are entered in the risk register at the start of the project.

What is FAT, and can the customer attend?

FAT is the factory acceptance test carried out before a panel is shipped. The customer or their representative can attend; if attendance is not possible, the test records and reports are shared.

What happens if I request a change of scope?

The request is logged as a written change; its schedule, cost and technical impacts are assessed and submitted for your approval. No change is released to production until it is approved.

Which documents are delivered at the end of the project?

As-built drawings, test and FAT reports, the bill of materials, warranty documents, operating and maintenance instructions and the label list are delivered in a single close-out file.

Read More

You May Also Be Interested In

Let’s Pin Down Your Project Schedule

Share your specification and target commissioning date, and Devpan’s project management team will run a critical path analysis and prepare a realistic delivery schedule.

If an ongoing project is under schedule pressure, we can review the current schedule together and assess options to speed it up.

Contact Us